INSTALLING CALISTHENICS EQUIPMENT IN WOOD CHIPS
We can install in wood chips.
The installation process is very straight forward and similar to grass installations. Once the bars have been laid in position, we’ll clear an area where post needs to be installed and cut the membrane. Once the post has been installed, we’ll cut the small square of membrane to fit around the post and relay it. We’ll then distribute the wood chips back in to position for a tidy finish.
Some wood chips can cause a moist and humid environment around the posts. Once installed, these conditions can accelerate a decay process, which can cause posts to rot. We mitigate this by using tanalised (also know as pressure-treated) timber that is protected to a UC4 level (ground contact).